
Work on the foundation of the waterfall feature (06-14-2010)

New sidewalk on the west side of the building (06-14-2010)

Work being done on the columns in front of the fireplace in the coffee shop lobby (06-14-2010)

In this photo you can see the rocks being placed on the columns in front of the fireplace (06-14-2010)

Grant/Highland Room (06-14-2010)
Amphitheatre bench seating taking shape (06-16-2010)
View of the amphitheatre bench seating (facing east) (06-16-2010)
Installing rock on the fireplace in the coffee shop lobby (06-16-2010)
Work continues on the sidewalk that will link Broadway Commons to the main church building (06-16-2010)
Adding rocks to the waterfall feature (06-16-2010)


