Facing south in the coffee shop; along the south wall you can see three sections of opening glass walls (“Nana Walls”) that we will be able to open on nice, sunny days (06-03-2010)

View of the Nana Walls from the outside (06-03-2010)

Grant/Highland Room on the second floor with installed carpet (06-03-2010)

Third floor conference room with installed carpet (06-03-2010)

Third floor classroom with installed carpet (06-03-2010)

Third floor warming kitchen (06-03-2010)

Restroom (06-03-2010)

Standing in the main room of The Upper Room (facing north) (06-03-2010)

Standing in the lobby of The Upper Room (facing south); you can see the door into the main room on the right half of the photo (06-03-2010)

Concrete being poured into forms for the waterfall feature (06-03-2010)

Forms set up for the bench seating in the amphitheatre, ready for concrete to be poured (06-03-2010)

Concrete being poured in the amphitheatre (06-03-2010)

06-03-2010