
View from where the coffee shop service bar will be, looking east through the lobby (05-20-2010)

Information Desk on the first floor in the coffee shop lobby (05-20-2010)

Second floor coffee shop seating area outside of the three conference rooms (05-20-2010)

View facing south in The Upper Room; in the foreground of the photo you can see the beginnings of the wall that will separate the main prayer room from the lobby area (05-20-2010)

Work on the outdoor amphitheatre (05-20-2010)

View from the southeast with the amphitheatre in the foreground beginning to take shape (05-20-2010)

Rocks (in the foreground of the photo) piled up and ready to be placed inside the waterfall feature that will be built on the southwest end of the property (05-20-2010)


