
Completed installation of the two elevators; elevator interior finishes will be completed later (04-29-2010)

View to the southeast looking out from the coffee shop lobby (04-29-2010)

Initial work on the outdoor amphitheatre that will be located off the southeast corner of Broadway Commons (04-29-2010)


