
Initial preparation for new curbs on the southwest corner of the property (04-21-2010)

Grant/Highland Room with cabinetry, lighting and speakers installed (04-21-2010)

Third floor board room with cabinetry installed (04-21-2010)

Third floor meeting room with cabinetry and lighting installed (04-21-2010)


