
Wall board installation completed (view from second floor lounge facing northwest) (03-17-2010)

Curbs were poured in preparation for the new parking lot (03-17-2010)

View looking east from the bridge in the lobby overlooking some of the coffee shop seating areas; you can see the newly installed wall board and railings (03-17-2010)


