With the exterior brick installation completed on the south end of the building, work moved to the west side. (03-03-2010)

View looking west in the coffee shop lobby (03-03-2010)

View looking west into the Grant/Highland Room from the second floor lounge; with the insulation installed the wall board is ready to go up. (03-03-2010)

Second floor classroom with wall board installed (03-03-2010)